Tullibardine Distillery

Date - Winter 2017
Summary - Structural Repairs (Scotland) Ltd recently constructed a screed to falls, sump collection area, bund walls and applied chemical resistant coating to bund refurbishment in Tullibardine distillery.

Badly deteriorated concrete slab with heavy pitted corrosion due to chemical contamination and exposure. Required full mechanical removal, base preparation, epoxy bonded screed installation and overcoating with three coat chemical resistant FerFa 5 system.

The Fraser Bruce Group
Millhall, Stirling, FK7 7LT

 

© 2019 The Fraser Bruce Group.

All Rights Reserved.

  • Black Facebook Icon
  • Black Twitter Icon