Stirling University Campus

System - Resin Bound System
Date - Summer 2018
Summary - Resarf Flooring Ltd installed Addagrip's Addaset Resin Bound system using a Lucerne Silver aggregate to a communal thorougfare area within wthe halls of residence at the University.
IMG_2151.JPG
IMG_2152.JPG

The tar was installed by J Sives Surfacing to the designated specification and allowed to cure for 7 days. We then installed a 16mm depth system for pedestrian trafficking to the University

IMG_2196.JPG
IMG_2198.JPG