Reservoir Spillway Repairs

Date - 2015
Summary - The scour blocks on the perimeter of the spillway had badly deteriorated over time due to exposure to the elements and fast moving water during overspill. These blocks required to be cut out, shuttered and repaired with a fast cure, high strength cementitious material.

Badly deteriorated scour blocks which were cut out, shuttered to mirror existing profiles and poured with a high strength repair grout.