top of page
East Kilbride
System - Stirling Lloyd
Date - Spring 2018
Summary - A new development of houses on the old Rolls Royce site in East Kilbride exposed a culvert running through site. Due to deterioration, the Main Contractor was required to replace the exisiting culvert lid with a new concrete structure. We were asked to provide a waterproof coating to the new concrete.


Our process involved preparation of the sibstrate by grinding to provide an open textured, aggregated appearance. The prepared concrete was treated with a four layer build up: one coat Stirling Lloyd Par 1 Primer , two coats Stirling Lloyd Eliminator and finished with a 3mm protection board prior to backfill.
Total of 150m2 treated over a 2 day process
bottom of page