East Kilbride

System - Stirling Lloyd
Date - Spring 2018
Summary - A new development of houses on the old Rolls Royce site in East Kilbride exposed a culvert running through site. Due to deterioration, the Main Contractor was required to replace the exisiting culvert lid with a new concrete structure. We were asked to provide a waterproof coating to the new concrete.
Waterproof Coating Scotland
Waterproof Coating Scotland

Our process involved preparation of the sibstrate by grinding to provide an open textured, aggregated appearance. The prepared concrete was treated with a four layer build up: one coat Stirling Lloyd Par 1 Primer , two coats Stirling Lloyd Eliminator and finished with a 3mm protection board prior to backfill.

Total of 150m2 treated over a 2 day process