Dundee Energy Recycling Centre

Date - Mid 2013
Summary - There was a badly deteriorated structural concrete slab within the waste disposal area of the Recycling Centre that required a hydro-demolition cut out and high strength concrete re-instatement. As part of these works we also dealt with the drainage issue within the area and installed structurally supportive surface drainage suitable for HGV trafficking.
Concrete Repair Scotland
Concrete Repair Scotland

Exposed steel following hydro demolition to slab and new steel installed into drainage channel. High strength concrete installed to main slab and high strength pre-bagged material, Aco Channel and arris supportive mastic installed drainage channel.

Concrete Repair Scotland